⚡NEN-Hub
🔍

Last Minute Risk Assessment

LMRA (Laatste Minuut Risico Analyse)
Also known as: lmra, last-minute-risk, last-minute-risk-assessment, lmra-wanneer, taakrisico, tri, task-risk, toolbox-talk, multi-lock, multilock, klic, crow-500, re-energiseren

Brief, personal risk check immediately before work commencement on site—verify that the work environment, equipment, and PPE match the work permit or procedure.

Practical example

LMRA (Last Minute Risk Analysis). Before climbing into a switchboard, the technician checks if PPE is complete and if the work permit matches the current site conditions.

Common mistake

LMRA (Last Minute Risk Analysis): Checking LMRA as a formality without assessing the actual situation—changes since permit issuance (e.g., wet floor, extra obstacle) are missed.

See also

Beschikbaar in: English, Nederlands, Polski, Русский, Українська
Last Minute Risk Assessment — dictionary · NEN-Hub