Last Minute Risk Assessment
LMRA (Laatste Minuut Risico Analyse)
Also known as: lmra, last-minute-risk, last-minute-risk-assessment, lmra-wanneer, taakrisico, tri, task-risk, toolbox-talk, multi-lock, multilock, klic, crow-500, re-energiseren
Brief, personal risk check immediately before work commencement on site—verify that the work environment, equipment, and PPE match the work permit or procedure.
Practical example
LMRA (Last Minute Risk Analysis). Before climbing into a switchboard, the technician checks if PPE is complete and if the work permit matches the current site conditions.
Common mistake
LMRA (Last Minute Risk Analysis): Checking LMRA as a formality without assessing the actual situation—changes since permit issuance (e.g., wet floor, extra obstacle) are missed.
See also
Related terms
In-depth guides
- → VCA Work permit & LMRA — the last-minute risk analysis before electrical work
- → Inspectie Inspection report, risk class & liability (NEN 3140)
- → §6.3 Arc flash — risk, energy and PPE
- → IEC 61230 (aardingsset) Earthing and short-circuiting sets — periodic testing per IEC 61230
- → Inspectie Testing the RCD — trip time and residual current (NEN-EN-IEC 61557-6)
- → Inspectie ATEX explosion-hazard zones — classification & inspection
Beschikbaar in: English, Nederlands, Polski, Русский, Українська