Last Minute Risk Assessment
LMRA (Laatste Minuut Risico Analyse)
Also known as: lmra, last-minute-risk, last-minute-risk-assessment, lmra-wanneer, taakrisico, tri, task-risk, toolbox-talk, multi-lock, multilock, klic, crow-500, re-energiseren
Brief, personal risk check immediately before work commencement on site—verify that the work environment, equipment, and PPE match the work permit or procedure.
See also
Related terms
In-depth guides
- → §6.3 Arc flash — risk, energy and PPE
- → B/C/D Circuit breaker characteristics B, C and D — the real difference
- → Examen Exam day — checklist, common mistakes and a fixed answer rhythm
- → §3.6 Danger zone and approach zone — the three types of electrical work
- → Hercertificering NEN 3140 recertification — how often must VP/VOP be renewed?
- → Inspectie Periodic inspection according to NEN 3140
Beschikbaar in: English, Nederlands, Polski, Русский, Українська