Four-Quadrant Metering (Import/Export Energy Meter)
A metering principle in which an energy meter registers not only the imported and exported active energy, but also distinguishes between inductive and capacitive reactive power in both directions, resulting in four separately recorded measurement values (quadrants). This is essential in installations with a PV inverter, home battery or other feed-back, because a simple meter that only registers the net balance (net consumption minus feed-back) gives no insight into the actual gross import and export, which is needed for correct billing, net-metering arrangements and grid operator contracts. The Dutch smart meter (P1 port) typically registers import and export registers separately, but not always the full four-quadrant split of reactive power.
Bij een grootzakelijke aansluiting met een grootschalig batterijopslagsysteem eist de netbeheerder een vierkwadrantmeter, zodat naast de netto energiestroom ook het geleverde en opgenomen blindvermogen apart zichtbaar is voor de aansturing van de arbeidsfactorcorrectie.
Bij een PV-installatie met saldering uitgaan van de nettotelwerken van de slimme meter alleen, zonder te controleren of de meter daadwerkelijk bruto import en export gescheiden registreert — bij een storing in de saldering of bij afschaffing van de salderingsregeling is dat onderscheid essentieel voor een correcte afrekening.